For grid connection processing at network operators and municipal utilities

Grid connection requests complete,before the deadline runs.

The automation checks each inquiry for completeness, requests missing documents, creates facility and planned device in the billing system and monitors deadlines. Network check and approval remain with you.

View the case
Installer portal
request 2026-NA-3381
Facility
PV 14.6 kWp with storage
Installer
Elektro Wimmer
Documents
Data sheets, site plan
Automation transfers and checks
Grid connection
process request
  • Installer checked in directory
  • Facility and device created
  • Missing circuit diagram requested
  • Network check by network planning

request prepared, awaits your approval

Approve

What we often hear from grid connection clerks

  1. “Every day inquiries for PV, storage, wallboxes, and heat pumps arrive, via portal, form, and email.

  2. We check for completeness, request missing documents, create the application, forward to network planning. Statutory response deadlines run from receipt.

  3. We've introduced a connection portal, checklists for installers and an inbox for supplementary requests.

  4. Not all installers use the portal. Portal, GIS and billing system are separated, and we transfer everything manually.

  5. Inquiries are increasing, and deadlines are statutory.

  6. Now the automation checks every inquiry, follows up, and creates facility. We check grid and grant approval.”

The case in brief

The situation

Grid connection requests for PV and heat pumps come through many channels and under statutory deadlines. Processing wants to give every request complete and on time to network planning. Separate systems make every request transfer work.

What is often tried

  • Connection portalWhy it's not enough

    Not all installers use.

  • Checklists for installersWhy it's not enough

    Improve inquiries, the transfer remains.

  • Shared inbox for additional claimsWhy it's not enough

    Collects, but doesn't track deadlines.

What nutona offers

You describe the workflow in chat. nutona checks the automation for quality and security, operates it in EU cloud and shows every run with costs in dashboard. Failed steps are retried, errors reported. So every request is complete on time, and grid planning gets finished operations.

Who does what

Automation takes over that

  • Check request for completeness and installer entry

  • Request missing documents

  • Create facility and planned device in billing system

  • Monitor deadlines, enter end dates after commissioning

That remains with you

  • Technical network check

  • Grid connection approval

  • Approval of transactions

Does it work similarly for you?

Describe your workflow to us. We'll show you what the automation looks like for it.

More use cases

Claim 2 months free now

We credit you 2 months of the starter plan for free. We are in an exclusive beta with selected customers. We'll be in touch.

We only use your details for the beta. More in our privacy policy.