For grid connection processing at network operators and municipal utilities
Grid connection requests complete,before the deadline runs.
The automation checks each inquiry for completeness, requests missing documents, creates facility and planned device in the billing system and monitors deadlines. Network check and approval remain with you.
- Facility
- PV 14.6 kWp with storage
- Installer
- Elektro Wimmer
- Documents
- Data sheets, site plan
- Installer checked in directory
- Facility and device created
- Missing circuit diagram requested
- Network check by network planning
request prepared, awaits your approval
What we often hear from grid connection clerks
“Every day inquiries for PV, storage, wallboxes, and heat pumps arrive, via portal, form, and email.
We check for completeness, request missing documents, create the application, forward to network planning. Statutory response deadlines run from receipt.
We've introduced a connection portal, checklists for installers and an inbox for supplementary requests.
Not all installers use the portal. Portal, GIS and billing system are separated, and we transfer everything manually.
Inquiries are increasing, and deadlines are statutory.
Now the automation checks every inquiry, follows up, and creates facility. We check grid and grant approval.”
The case in brief
The situation
Grid connection requests for PV and heat pumps come through many channels and under statutory deadlines. Processing wants to give every request complete and on time to network planning. Separate systems make every request transfer work.
What is often tried
- Connection portalWhy it's not enough
Not all installers use.
- Checklists for installersWhy it's not enough
Improve inquiries, the transfer remains.
- Shared inbox for additional claimsWhy it's not enough
Collects, but doesn't track deadlines.
What nutona offers
You describe the workflow in chat. nutona checks the automation for quality and security, operates it in EU cloud and shows every run with costs in dashboard. Failed steps are retried, errors reported. So every request is complete on time, and grid planning gets finished operations.
Who does what
Automation takes over that
Check request for completeness and installer entry
Request missing documents
Create facility and planned device in billing system
Monitor deadlines, enter end dates after commissioning
That remains with you
Technical network check
Grid connection approval
Approval of transactions
Does it work similarly for you?
Describe your workflow to us. We'll show you what the automation looks like for it.