For feed-in management at network operators and municipal utilities
Network operator verification in MaStR,reconciled field by field.
The automation compares each unit in the market master data register with your connection and device data, confirms matches, drafts correction inquiries and writes back the MaStR number. You decide on deviations and payment blocks.
- Commissioning
- 14.11.2026
- Gross capacity
- 9.9 kW
- Metering location
- DE00012345678900000000000001234
- Date and location match
- Metering location correct
- MaStR number entered
- Output 9.9 kW instead of 8.0 kW according to registration
reconciliation complete, awaits your approval
What we often hear from feed-in management
“Every week the MaStR shows us new units for grid operator review.
We compare each one field by field with our data: commissioning, output, location, metering point. If a facility isn't registered, we may not pay out.
We compare window next to window, have a list of open reviews, and template letters for corrections.
Comparison on screen is still typing with the eyes. The list grows with each new PV system.
Reconciliation runs between a web portal and our billing system.
Now the automation reconciles every unit and prepares confirmation or correction. We decide deviations and payment blocks.”
The case in brief
The situation
Every new facility in the grid area waits in MaStR for review by the grid operator. Feed-in management wants to keep register and own data aligned. The field comparison between portal and system costs much time with growing number of facilities.
What is often tried
- Side-by-side window comparisonWhy it's not enough
Remains typing with eyes.
- List of open inspectionsWhy it's not enough
Grows with each new facility.
- Sample letters for correctionsWhy it's not enough
Help with writing, not with checking.
What nutona offers
You describe the workflow in chat. nutona checks the automation for quality and security, operates it in EU cloud and shows every run with costs in dashboard. Failed steps are retried, errors reported. So every unit is checked quickly, and MaStR number is in own system.
Who does what
Automation takes over that
Open list of units for inspection
Compare commissioning, capacity, location and metering point with own data
Prepare matches for confirmation, draft correction requests
Enter MaStR number in own facility record
That remains with you
Deviating cases
Payment blocks for non-registered facilities
Does it work similarly for you?
Describe your workflow to us. We'll show you what the automation looks like for it.