For the office in electrical, solar, and heating companies

Register systems with the network operator,regardless of which portal they have.

The automation fills out the registration in the responsible network operator's portal, uploads the documents, tracks the status and answers additional requests. The registered electrical specialist gives technical approval.

View the case
Order
PV system Lechner family
Service
9.9 kWp
Inverter
8 kVA
Storage
10 kWh
Automation transfers and checks
Network operator portal
Grid connection request
  • Operator and parcel entered
  • Data sheets and unit certificates uploaded
  • Single-line diagram and site plan attached
  • Approval by qualified electrician

request prepared, awaits your approval

Approve

What we often hear from solar and electrical contractors

  1. “Every PV system, storage, and heat pump must be registered with the grid operator: once before construction, once after commissioning.

  2. There are hundreds of grid operators, each with their own portal and mandatory documents. If a document is missing, the customer waits for the meter change.

  3. We have a list of network operators with their requirements, document packages per manufacturer and tested a planning platform with registration support.

  4. The list is incomplete with every new territory. The platform doesn't cover every operator, and the subsequent demands still arrive with us.

  5. We cannot choose the grid operator, and access depends on the registered master electrician.

  6. Now the automation submits the registration in the right portal, tracks the status and answers supplementary requests. Our qualified electrician gives technical approval.”

The case in brief

The situation

PV systems, storage and heat pumps must be registered with local network operator, and each has its own portal. The office wants to complete every registration so meter is exchanged on time. Additional requests and status checks drag on for weeks.

What is often tried

  • List of network operatorsWhy it's not enough

    Incomplete in every new area.

  • Planning platform with login assistanceWhy it's not enough

    Does not cover every network operator.

  • Document packages per manufacturerWhy it's not enough

    Help with collecting, not with filling out.

What nutona offers

You describe the workflow in chat. nutona checks the automation for quality and security, operates it in EU cloud and shows every run with costs in dashboard. Failed steps are retried, errors reported. So every registration goes out complete, and additional demands don't remain pending.

Who does what

Automation takes over that

  • Find responsible grid operator for the address and open the portal

  • Enter operator, address, parcel, plant type and capacities

  • Upload data sheets, certificates, circuit diagram and site plan

  • Track status, respond to additional requests, report commissioning

That remains with you

  • Technical approval by registered electrician

  • Approval of each registration

  • The installer access

Does it work similarly for you?

Describe your workflow to us. We'll show you what the automation looks like for it.

More use cases

Claim 2 months free now

We credit you 2 months of the starter plan for free. We are in an exclusive beta with selected customers. We'll be in touch.

We only use your details for the beta. More in our privacy policy.