For the office in electrical, solar, and heating companies
Register systems with the network operator,regardless of which portal they have.
The automation fills out the registration in the responsible network operator's portal, uploads the documents, tracks the status and answers additional requests. The registered electrical specialist gives technical approval.
- Service
- 9.9 kWp
- Inverter
- 8 kVA
- Storage
- 10 kWh
- Operator and parcel entered
- Data sheets and unit certificates uploaded
- Single-line diagram and site plan attached
- Approval by qualified electrician
request prepared, awaits your approval
What we often hear from solar and electrical contractors
“Every PV system, storage, and heat pump must be registered with the grid operator: once before construction, once after commissioning.
There are hundreds of grid operators, each with their own portal and mandatory documents. If a document is missing, the customer waits for the meter change.
We have a list of network operators with their requirements, document packages per manufacturer and tested a planning platform with registration support.
The list is incomplete with every new territory. The platform doesn't cover every operator, and the subsequent demands still arrive with us.
We cannot choose the grid operator, and access depends on the registered master electrician.
Now the automation submits the registration in the right portal, tracks the status and answers supplementary requests. Our qualified electrician gives technical approval.”
The case in brief
The situation
PV systems, storage and heat pumps must be registered with local network operator, and each has its own portal. The office wants to complete every registration so meter is exchanged on time. Additional requests and status checks drag on for weeks.
What is often tried
- List of network operatorsWhy it's not enough
Incomplete in every new area.
- Planning platform with login assistanceWhy it's not enough
Does not cover every network operator.
- Document packages per manufacturerWhy it's not enough
Help with collecting, not with filling out.
What nutona offers
You describe the workflow in chat. nutona checks the automation for quality and security, operates it in EU cloud and shows every run with costs in dashboard. Failed steps are retried, errors reported. So every registration goes out complete, and additional demands don't remain pending.
Who does what
Automation takes over that
Find responsible grid operator for the address and open the portal
Enter operator, address, parcel, plant type and capacities
Upload data sheets, certificates, circuit diagram and site plan
Track status, respond to additional requests, report commissioning
That remains with you
Technical approval by registered electrician
Approval of each registration
The installer access