For facility management and accounting departments with their own energy systems
New installation, registered on time,from protocol and data sheet.
The automation fills out the registration in the market master data register from commissioning protocol and data sheet. You approve.
- Service
- 148.5 kWp
- Commissioning
- 04.11.2026
- Inverter
- 3 x 50 kW
- Location and capacity
- Commissioning date
- Technical data from data sheet
- Check grid connection point
Registration prepared, waiting for your approval
What we often hear from building services
“Every new energy system, whether photovoltaic, CHP, storage, or emergency generator, must go into the market master data register within one month.
We look for log and data sheet and type in the technical data. If we miss the deadline, it can cost us the payment.
Usually the installer did that. For changes and inspection queries we write a note.
With emergency power and storage the installer often doesn't bother. Verification requests come years later.
It's a one-time task per facility, with a short deadline.
Now the automation fills registration from our documents. We approve and send the number to the grid operator.”
The case in brief
The situation
Own energy installations must be in the market master data register within one month of commissioning. Building services wants to register on time and correctly. It rarely happens, and the data are in protocols and data sheets.
What is often tried
- Registration by installerWhy it's not enough
The usual way, but not reliable for every facility.
- Note for later audit requestsWhy it's not enough
Cannot be found after years.
- Manual registrationWhy it's not enough
Rare and therefore error-prone.
What nutona offers
You describe the workflow in chat. nutona checks the automation for quality and security, operates it in EU cloud and shows every run with costs in dashboard. Failed steps are retried, errors reported. So every system is registered on deadline, and you only approve.
Who does what
Automation takes over that
Create unit with location, capacity, commissioning and grid connection
Enter technical data from data sheet
Stop before sending
File registration confirmation and provide number for grid operator
That remains with you
Approval of registration
Coordination with grid operator
Does it work similarly for you?
Describe your workflow to us. We'll show you what the automation looks like for it.