For quality engineers whose customers require the 8D report in their own tool
Write the 8D report once,not twice.
The automation transfers your internal 8D to the customer portal fields, attaches documentation and tracks customer response. You approve content and each stage.
- Level
- D4 to D5
- Cause
- Tool wear punch 3
- Proofs
- 4 files
- D1 to D3 taken over
- Cause of occurrence and non-detection
- Measures with dates
- Submit level D5
Level D5 waiting for your approval
What we often hear from quality engineers at suppliers
“We write our 8D report in the QMS. But the customer wants it in their own portal, field by field: team, problem, containment actions, cause, corrective actions.
This goes over days and weeks in multiple stages, each with its own deadline. Every statement affects supplier rating and is liability-relevant.
We've uploaded the report as PDF instead of filling fields, and handed portal maintenance to an assistant.
The PDF isn't enough for the customer, they want the fields. The assistant doesn't know the content and asks at every level.
So the report already exists and is still retyped, at every level again.
Now the automation transfers the internal 8D to the portal fields, attaches the evidence and reports when the customer responds. We approve each stage.”
The case in brief
The situation
Customers want to see 8D reports in their own tool, stage by stage with deadlines. The quality engineer wants to put their time into the root cause. The report already exists internally and still gets retyped for the portal.
What is often tried
- upload 8D as PDFWhy it's not enough
The customer requires the fields in the portal, not just an attachment.
- Assign portal maintenance to an assistantWhy it's not enough
Does not know contents and needs queries at every stage.
- Write the 8D directly in the portalWhy it's not enough
Then report missing in own CAQ.
What nutona offers
You describe the workflow in the chat. nutona checks the automation for quality and security, operates it in the EU cloud and shows every run with costs in the dashboard. Failed steps are retried, errors reported. This way each 8D stage is on time in the portal, and your engineers work on the root cause.
Who does what
Automation takes over that
Read internal 8D from the CAQ or from Word and Excel
Enter team, problem, and immediate actions in D1 to D3
Transfer cause and measures with responsible persons and dates
Attach photos, measurement reports and production control plan
Track and report customer reply
That remains with you
Content of the 8D report
Approval of each stage
Conversation with the customer's quality officer
Does it work similarly for you?
Describe your workflow to us. We'll show you what the automation looks like for it.